Preparation of Master Plan: 

            The Brahmaputra Board has so far prepared Master Plan of various rivers and tributaries of Brahmaputra and Barak river system and rivers of Tripura. Due to enormity of the task, the work has been  divided into three parts as under: 

1. Master Plan Part-I:               i.e. Main stem of Brahmaputra

2. Master Plan Part-II:              i.e. the Barak river and its eight important tributaries.

3. Master Plan Part-III:             i.e. important tributaries of the Brahmaputra, Barak , eight rivers of Tripura and Majuli Island.

 

1
Master plan Part-I: i.e. Main stem of Brahmaputra.
  
2
Master plan Part-II: i.e. the Barak river and its eight important tributaries.
  
3
Master Plan Part-III: i.e. important tributaries of the Brahmaputra, Barak, eight rivers of Tripura and Majuli Island.
  
Master Plan (Part-l)
  

The Master Plan Part-I (on main stem of Brahmaputra) was first prepared in in 1986. This was approved by the Ministry of Water Resources, Govt. of India during July, 1997 after modification in 1995.

Master Plan-(Part-II)

The Master Plan part-ll dealing with Barak and its tributaries was prepared in 1988. The Master Plan part-II along with the addendum volume was approved by the Ministry of Water Resources, Govt. of India during July,1997.
  

Recommendation Made
  
Part-l-Pertaining to investigations and interim measure.
  
The recommendations are as follows.
  
(i)

Establishment of additional hydrometeorological and hydrological stations. In order to bring network of rain gauges in the river basins to the standard of World Meteorological Stations, additional ordinary rain gauges and self recording rain gauges are to be installed.
  

(ii)

For further seismological studies, MEQ recorders have to be set up at Dihang, Subansiri, Lohit, Dibang, Noa-Dehing, Jia Bharali (Kameng) and Manas dam site. Six MEQ recorders have to be set up on each site.
  

(iii)

The existing flood forecasting centers are to be improved in respect of data collection from additional sites and other integrated network apart from changes for better technique and methodology.
  

(iv)

Anti-erosion measures are to be taken up from time to time where such bank erosion are observed.
  

(v)

The gaps in the embankments are to be filled up and certain embankments have to be strengthened and extended.
  

(vi)

Identified drainage congested areas are to be further studied and schemes prepared.
  

(vii)

Set up of river research stations and allied laboratories required for Geo-morphological and allied studies of the river.
  

Part-II-concerning long term measures are as follows
  
(i) Multipurpose Storage Dam.
  

Project reports for Dihang dam project and Subansiri dam project were prepared simultaneously with the master plans. There are also proposals for more than dozen other multi-purpose projects in both the basins out of which the following major projects are identified to have more effect on flood moderation and potential for power generation. These are Lohit, Dibang, Noa-Dehing, Jia Bharali (Kameng) in Brahmaputra Basin, in Arunachal Pradesh, Tipaimukh in Barak Basin, in Manipur/ Mizoram.
  

(ii) Watershed Management.
  

The total area in the basins measures 196.3 lakh ha. out of which 126 lakh ha is below permanent snowline. It was envisaged the area requiring integrated watershed management would be around 15% which is about 20 lakh ha.

 

 
(iii) Other recommendations.

Irrigation, Micro and medium hydel schemes and bulk transmission of power which are not directly related to flood control measures are not presented in the Master Plan.


  
Master plan Part-III
  

The draft master plan part-III comprising 39 tributaries of the river Brahmaputra, one tributary of Barak, 8 rivers of Tripura and Majuli Island was started during 1989-90 so far 32 Nos tributaries Master plan have been modified out of which 27 Nos. was approved by the Board and approved Master plans have been submitted to the MOWR for acceptance. Other five master plans have been completed and circulated for approval. The basin wise status of Master Plans are as follows.

 

STATUS OF MASTER PLAN AS ON 31-05-2011

Activity
Status
A     Main River  
1.     Brahmaputra Main Stem  
2.     Barak & its Tributories  
B     Tributaries  
1
Buridihing Approved by the Govt. of India
2
Dikhow Approved by the Govt. of India
3
Dhansiri (s) Approved by the Govt. of India
4
Kapili Kolong Approved by the Govt. of India
5
Puthimari Approved by the Govt. of India
6
Ranganadi Approved by the Govt. of India
7
Gumti Approved by the Govt. of India
8
Pagladiya Approved by the Govt. of India
9
Noa-nadi Approved by the Govt. of India
10
Dikrong Approved by the Govt. of India
11
Muhuri Approved by the Govt. of India
12
Jia-Bharali Approved by the Govt. of India
13
Manu Approved by the Govt. of India
14
Champamati Approved by the Govt. of India
15
Disang Approved by the Govt. of India
16
Jinary Approved by the Govt. of India
17
Na-Noi Approved by the Govt. of India
18
Juri Approved by the Govt. of India
19 Burima Approved by the Govt. of India
20 Dhalai Approved by the Govt. of India
21 Jiadhal Approved by the Govt. of India
22 Bharalu Approved by the Govt. of India
23 Lohit Approved by the Govt. of India
24 Majuli Island (special case) Approved by the Govt. of India
25 Khowai Approved by the Govt. of India
26 Ghiladhari Approved by the Govt. of India
27 Jinjiram Approved by the Govt. of India
28 Dhaleswari Approved by the Govt. of India
29 Moridhal Approved by the Govt. of India
30 Jhanji Approved by the Govt. of India
31 Subansiri Approved by the Govt. of India
32 Gaurang Approved by the Govt. of India
33 Haora Approved by the Govt. of India
34 Gabharu Approved by the Govt. of India
     
35 Gadadhar Approved by B.Board & submitted to MoWR
36 Bhogdoi Approved by B.Board & submitted to MoWR
37 Belsiri Approved by B.Board & submitted to MoWR
38 Kulsi-Deosila Approved by B.Board & submitted to MoWR
39 Deopota Approved by B.Board & submitted to MoWR
40 Buroi Approved by B.Board & to be submitted to MoWR for incorporating IMD Data
     
  
 
41
Dhansiri (North) Completed & circulated to Board Members
42
Barnadi Completed & circulated to Board Members
  
43 Beki-Manas-Aie Approved by B.Board & submitted to MoWR
44 Brahmajan Approved by B.Board & submitted to MoWR, awaited for approval og Govt. of India
45 Dudhnoi-Krishnai Approved by B.Board & submitted to MoWR
     
46 Tipkai Approved by B.Board & submitted to MoWR
47 Bargang Approved by B.Board & submitted to MoWR
48 Sankosh Under modification
49 Tangani Under modification
50 Simsang Under preparation
51 Kynshi Under preparation
52 Um-n-got Under preparation
53 Tista Under preparation
54 Jaldhaka Under preparation
55 Torsa-Raidak Under preparation
    Under preparation